Architectural and M&E works are taking place within the completed structure of the RTS facility building. The completed 2 tunnels from SBAB have been handed over to T250, while FSC works are underway along the 2 tunnels from Springleaf. The launch shaft at Springleaf has also been handed back to T208 for the structural & subsequent backfilling works.
| RTS Facility Building |
![]() |
| Removal of hoardings & gantry cranes dismantled by T207. Site handed over back to T208. |
| RC works for the tunnel wall construction |