Backfilling and fitting works are in progress at the station. RC works for all entrances have completed to ground level, and RC works on the ventilation superstructures are in progress.
| Mayflower Site |
| Utility diversions beneath the St 11 junction / Steel lift frame at entrance D |
| Entrance C & D |
| Entrance G & B |
| Entrance B |
| Cooling tower superstructure behind entrance G |
| Ventilation structure 1 beside the cooling tower |
| Ventilation structure 2 |
| Entrance E structure completed to threshold level |
| Ongoing sheet pile extraction at subway |
| Entrance A lift frame on site |
| Structure completed to threshold level, subway roof RC works in progress |
| Entrance A & F |