Saturday, 31 March 2018

Havelock Cast

Structural works are in progress within the station.


Havelock Site
Entrance E
RC works from upper concourse to roof slab

Entrance D excavation to formation level

Subway structure linking to Entrance D&E
Station site
Entrance A & Vent structure 01
Formwork at platform level
Casting of base slab (Photo: LTA)




Entrance B
Entrance C site