Tuesday 13 March 2018

Mayflower Fit-Out

Backfilling and fitting works are in progress at the station. RC works for all entrances have completed to ground level, and RC works on the ventilation superstructures are in progress.


Mayflower Site
Utility diversions beneath the St 11 junction / Steel lift frame at entrance D
Entrance C & D
Entrance G & B
Entrance B

Cooling tower superstructure behind entrance G

Ventilation structure 1 beside the cooling tower
Ventilation structure 2

Entrance E structure completed to threshold level

Ongoing sheet pile extraction at subway
Entrance F

Entrance A lift frame on site
Structure completed to threshold level, subway roof RC works in progress
Entrance A & F

No comments:

Post a Comment

Note: only a member of this blog may post a comment.