Marina Bay Cast (II)

Bulk excavation works for the NSL and CCL linkways are underway. The transfer level (B3) has been cast at the station and excavation works are progressing to the upper platform level.

Excavation of Circle Line linkway
CCL unpaid link excavation completed
CCL paid link excavation at S3 layer

Excavation of North South Line linkway
S2 installation in progress

Excavation works proceeding to S3 level
Adit tunnel construction

Station construction

Transfer level RC works (M&E service room area)