| Platform, tunnel walls and trackbed completed (September) |
![]() |
| RC works for the platform and formwork for tunnel walls (north end) |
| Formwork for platform roof/ mezzanine level construction |
![]() |
| Casting works (November) |
![]() |
| Completed cripple siding tunnel structure (C&C tunnel 1) (October) |
![]() |
| Centre arch tunnel to commence mining by early 2017 |
| First stage concreting works for the track bed and tunnel walls inside the SB tunnel |