Tuesday, 12 September 2017

Mayflower Cast (V)

A realignment of Avenue 4 has been implemented for the RC construction of the 7th and final entrance B. The superstructure works for Entrance E & G are underway, and casting works for the closing of the station box are in progress to complete the station structure.


Realignment of Avenue 4
Entrance D & C
Entrance D

Entrance C

Realignment of Avenue 4 for Entrance B construction
Removal of road decking for construction of Entrance B

Realignment of Avenue 4
Entrance G structure casting to ground level

Staircase for Entrance G
Vent shaft 2 & cooling tower at Entrance G

Casting of openings in the station structure
Entrance E RC works to ground level
Vent shaft 1 construction at Entrance E
Hacking of secant bored piles

Subway A/F site awaiting reinstatement as backfilling works are underway
Entrance F
Staircase constructed

Entrance A
Flood stairwell barrier cast 
Station overview

No comments:

Post a Comment

Note: only a member of this blog may post a comment.