Casting of the station's concourse slab is largely completed and works are proceeding up to the roof level. Excavation works at the crossover tunnel site have completed facilitating the breakthrough of the T206 tunnels.
T203 Woodlands |
Transfer link overview |
Columns for the overhead linkway from the NSL platform |
Atrium at ground level with constructed lift and escalator pits |
Escalator pits at the paid link end of the station concourse |
Subway works to the bus interchange |
Excavation works for the unpaid link within the bus interchange |
Concourse slab largely completed across the station box |
Construction of roof slab |
Roof slab completed |
Casting of roof slab over the platform area |
Casting of concourse slab at the zone adjacent to the crossover tunnel |
Crossover tunnel interface |
Excavation works completed at the crossover tunnel |
Entrance F & crossover tunnel site |
Entrance F |
Entrance G |
Excavation works at the S3 layer |