Having completed the Changi Bound tunnel from LS2 to Woodlands, the re-assembly of S-893 (TBM 1) is taking place at LS1 for the RT3 tunnel drive to Woodlands Station. The TBM is expected to launch next month and breakthrough by mid-2017. TBM 3 has been retrieved from Mandai Depot and is held at the surface of LS2, awaiting to be reassembled for the Changi bound tunnel drive to Woodlands South Station.
| Launch Shaft 1/ ES1 |
| Reassembly of S-893 and reaction frame within the shaft |
| Retrieved TBM 3 shield and cutterhead at LS2 |
| Tunnelling works on the Changi Bound tunnel to Woodlands still underway (S-894, left shaft) |
| Permanent drain base slab works at ES2 |
| RC wall construction on going at Sembawang Airbase C&C tunnel |
| Spare TBM 5 shield on the shaft surface for the re-drive RT2 tunnel to Mandai Depot |
| TBM 4 on its initial drive (RT1 to Mandai Depot) |
| SBAB and MDD |
| Breakthrough point at Mandai Depot |
| Mandai Depot |
| Casting works for the stabling yard and perimeter wall |