The first section of roof slab has been completed at the southern end of the station as structural works take shape.
Caldecott Station |
Entrance C |
Entrance D |
RC works at the concourse level |
Interface with the CCL station. A&A works will commence once the station structure is completed and struts are dismantled |
RC works for concourse level and walls leading up to roof |
RC works at roof slab |
Installation of rebar prior to casting |
Casting of lift shaft and staircase to ground level at new entrance A |
Station box completed at south end |
C&C tunnel interface |
Completed tunnel structure |
The remaining portion of tunnel will be constructed and backfilled after the mined tunnels are completed |