Tuesday, 11 July 2017

Havelock Excavation (III)

Rock excavation works continue at the station box, with works commencing on entrance B.


Havelock station overview


Excavation of station box at S6 level


Rock excavation
Excavation of upper concourse level at entrance B



Entrance C

Entrance D
Entrance E external wall cast
Column construction at entrance E
CRTG RTBM components being transferred over to the T216 Stevens site
Demobilization of site