The first section of roof slab has been completed at the southern end of the station as structural works take shape.


Caldecott Station

Entrance C
Entrance D
RC works at the concourse level

Interface with the CCL station. A&A works will commence once the station structure is completed and struts are dismantled
RC works for concourse level and walls leading up to roof
RC works at roof slab
Installation of rebar prior to casting
Casting of lift shaft and staircase to ground level at new entrance A

Station box completed at south end
C&C tunnel interface
Completed tunnel structure

The remaining portion of tunnel will be constructed and backfilled after the mined tunnels are completed