Platform, tunnel walls and trackbed completed (September) |
RC works for the platform and formwork for tunnel walls (north end) |
Formwork for platform roof/ mezzanine level construction |
Casting works (November) |
Completed cripple siding tunnel structure (C&C tunnel 1) (October) |
Centre arch tunnel to commence mining by early 2017 |
First stage concreting works for the track bed and tunnel walls inside the SB tunnel |