Excavation of the Dalvey launch shaft is now midway completed. The slurry treatment plant is in the midst of installation beside the shaft. D-walling and piling works continues at the Stevens station. Updates for the launch shaft at Mount Pleasant can be found here.
| Excavation and grouting at the Dalvey launch shaft |
| STP being assembled beside the site office |
| Excavation has reached about 20m in depth |
| Illumination of the launch shaft site at night |
| Piling at the SCGS site |