RC works for the platform and concourse level are taking place at the station box following the completion of excavation works.
| Excavation works completed at the Springleaf station |
| Entrance B |
| Preparations to cast base slab at GL 13-17 |
| Casting of concourse level / formwork for skin wall above woodlands bound trackway |
| Casting of concourse level / formwork for skin wall above changi bound trackway |
| Entrance A |
| Lean concrete placed at GL 2-7 base slab |
| Vent shaft 1 superstructure RC works |
| Entrance C roof slab cast |