Saturday, 25 June 2016

Marina South Excavation (III)

Bulk excavation works are underway at the station and cut and cover tunnels. The remaining pipe pile construction is being carried out beneath the former Marina Boulevard.


Excavation works at the cut and cover tunnel











Pipe pile construction beneath the old road


Excavation at Marina South station

Ground improvement works to Marina Bay

No comments:

Post a Comment

Note: only a member of this blog may post a comment.