Monday, 28 September 2015

Stevens D-walls (II)

Excavation of the Dalvey launch shaft is now midway completed. The slurry treatment plant is in the midst of installation beside the shaft. D-walling and piling works continues at the Stevens station. Updates for the launch shaft at Mount Pleasant can be found here.


Excavation and grouting at the Dalvey launch shaft

STP being assembled beside the site office

Excavation has reached about 20m in depth



Illumination of the launch shaft site at night















Piling at the SCGS site





No comments:

Post a Comment

Note: only a member of this blog may post a comment.