T205 Woodlands South Station. Escalators installed between the paid concourse down to the platform level. |
T205 - External fitting works at entrance A |
T203 Woodlands Station Concourse |
T206 - Compaction and reinstatement of earth around Escape shaft 1 |
T206 - Demotion of capping beam at Sembawang Airbase C&C tunnel |
T207 - External architectural works at the RTS Facility building |
T208 - Springleaf Station |
T209 - 1st Stage Concreting works within 5XO tunnel |
T210 - Mezzanine to Concourse level at Mayflower Station |
T211 - BSC achieved at Bright Hill Station |
T212 - Ring build within the abandoned shield of TBM 3 at Caldecott Station |
T213 - Caldecott Station |
T215 - Cross Passage mining works |
T216 - Entrance D surface parapet works |
T218 - Orchard Boulevard Station |
T218 - Concourse and Upper Concourse levels |
T219 - Orchard C&C tunnel works preparations for staging ground |
T221 - Havelock Entrance E backfill |
T221 - Bottom up casting of concourse slab completed |
T223 - Hacking of station d-wall at T225 TBM interface |
T227 - Marina South cripple siding tunnel |
T228 - SWC bracket installation works along the platform tunnel at Gardens by the Bay |
T228 - Entrance B RC works |