| T205 Woodlands South Station. Escalators installed between the paid concourse down to the platform level. |
| T205 - External fitting works at entrance A |
| T203 Woodlands Station Concourse |
| T206 - Compaction and reinstatement of earth around Escape shaft 1 |
| T206 - Demotion of capping beam at Sembawang Airbase C&C tunnel |
| T207 - External architectural works at the RTS Facility building |
| T208 - Springleaf Station |
| T209 - 1st Stage Concreting works within 5XO tunnel |
| T210 - Mezzanine to Concourse level at Mayflower Station |
| T211 - BSC achieved at Bright Hill Station |
| T212 - Ring build within the abandoned shield of TBM 3 at Caldecott Station |
| T213 - Caldecott Station |
| T215 - Cross Passage mining works |
| T216 - Entrance D surface parapet works |
| T218 - Orchard Boulevard Station |
| T218 - Concourse and Upper Concourse levels |
| T219 - Orchard C&C tunnel works preparations for staging ground |
| T221 - Havelock Entrance E backfill |
| T221 - Bottom up casting of concourse slab completed |
| T223 - Hacking of station d-wall at T225 TBM interface |
| T227 - Marina South cripple siding tunnel |
| T228 - SWC bracket installation works along the platform tunnel at Gardens by the Bay |
| T228 - Entrance B RC works |