More About Us

Friday 17 August 2018

LTA Update (Q2 2018)

T205 Woodlands South Station. Escalators installed between the paid concourse down to the platform level.
T205 - External fitting works at entrance A
T203 Woodlands Station Concourse
T206 - Compaction and reinstatement of earth around Escape shaft 1
T206 - Demotion of capping beam at Sembawang Airbase C&C tunnel
T207 - External architectural works at the RTS Facility building 
T208 - Springleaf Station
T209 - 1st Stage Concreting works within 5XO tunnel
T210 - Mezzanine to Concourse level at Mayflower Station
T211 - BSC achieved at Bright Hill Station
T212 - Ring build within the abandoned shield of TBM 3 at Caldecott Station
T213 - Caldecott Station
T215 - Cross Passage mining works
T216 - Entrance D surface parapet works
T218 - Orchard Boulevard Station
T218 - Concourse and Upper Concourse levels
T219 - Orchard C&C tunnel works preparations for staging ground
T221 - Havelock Entrance E backfill
T221 - Bottom up casting of concourse slab completed
T223 - Hacking of station d-wall at T225 TBM interface
T227 - Marina South cripple siding tunnel
T228 - SWC bracket installation works along the platform tunnel at Gardens by the Bay
T228 - Entrance B RC works

No comments:

Post a Comment

Note: only a member of this blog may post a comment.