Backfilling and fitting works are in progress at the station. RC works for all entrances have completed to ground level, and RC works on the ventilation superstructures are in progress.
Mayflower Site |
Utility diversions beneath the St 11 junction / Steel lift frame at entrance D |
Entrance C & D |
Entrance G & B |
Entrance B |
Cooling tower superstructure behind entrance G |
Ventilation structure 1 beside the cooling tower |
Ventilation structure 2 |
Entrance E structure completed to threshold level |
Ongoing sheet pile extraction at subway |
Entrance A lift frame on site |
Structure completed to threshold level, subway roof RC works in progress |
Entrance A & F |