Rock excavation works continue at the station box, with works commencing on entrance B.
Havelock station overview |
Excavation of station box at S6 level |
Rock excavation |
Excavation of upper concourse level at entrance B |
Entrance C |
Entrance D |
Entrance E external wall cast |
Column construction at entrance E |
CRTG RTBM components being transferred over to the T216 Stevens site |
Demobilization of site |