Rock excavation works continue at the station box, with works commencing on entrance B.
| Havelock station overview |
| Excavation of station box at S6 level |
| Rock excavation |
| Excavation of upper concourse level at entrance B |
| Entrance C |
| Entrance D |
| Entrance E external wall cast |
| Column construction at entrance E |
| CRTG RTBM components being transferred over to the T216 Stevens site |
| Demobilization of site |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.