RC works for the platform and concourse level are taking place at the station box following the completion of excavation works.


Excavation works completed at the Springleaf station

Entrance B
Preparations to cast base slab at GL 13-17

Casting of concourse level / formwork for skin wall above woodlands bound trackway
Casting of concourse level / formwork for skin wall above changi bound trackway
Entrance A
Lean concrete placed at GL 2-7 base slab
Vent shaft 1 superstructure RC works

Entrance C roof slab cast