RC works for the platform and concourse level are taking place at the station box following the completion of excavation works.
Excavation works completed at the Springleaf station |
Entrance B |
Preparations to cast base slab at GL 13-17 |
Casting of concourse level / formwork for skin wall above woodlands bound trackway |
Casting of concourse level / formwork for skin wall above changi bound trackway |
Entrance A |
Lean concrete placed at GL 2-7 base slab |
Vent shaft 1 superstructure RC works |
Entrance C roof slab cast |