More About Us

Friday, 3 March 2017

Springleaf Cast

RC works for the platform and concourse level are taking place at the station box following the completion of excavation works.


Excavation works completed at the Springleaf station

Entrance B
Preparations to cast base slab at GL 13-17

Casting of concourse level / formwork for skin wall above woodlands bound trackway
Casting of concourse level / formwork for skin wall above changi bound trackway
Entrance A
Lean concrete placed at GL 2-7 base slab
Vent shaft 1 superstructure RC works

Entrance C roof slab cast

No comments:

Post a Comment

Note: only a member of this blog may post a comment.