Wednesday, 12 April 2017

Orchard Cast (III)

Excavation and casting of the permanent structure continues.


Station site
Lowering of replacement shield for TBM S-963 in end Q1 for second drive towards Orchard Boulevard (Photo: Asiagroup Crane)
TBM assembly inside launch shaft on Woodlands bound drive
RC works presumably at platform level

Underpass works at ION orchard
Excavation of subway linkway to Wheelock
Excavation works for cut and cover tunnel
Tunnel roof slab cast







No comments:

Post a Comment

Note: only a member of this blog may post a comment.