| T201 - Driveway within Mandai Bus Depot |
![]() |
| T202 - Entrance D Structural Steel roof works |
![]() |
| T202 - Cladding works at Woodlands North Concourse level |
![]() |
| T203 - Woodlands Station |
![]() |
| T203 - PSD installation at platform |
![]() |
| T205 - Woodlands South Entrance C ceiling works |
![]() |
| T205 - Installation of travellators at concourse level to future Woodlands health complex |
![]() |
| T206 - Reinstatement works at ES1 |
![]() |
| T207 - Temporary boundary operational limits for TEL1 setup at the RTS Facility Building |
![]() |
| T208 - Springleaf vent shaft RC works completed |
![]() |
| T208 - Springleaf concourse level free area flood screening completed |
![]() |
| T209 - Lentor Station |
![]() |
| T209 - RC works at Entrance A |
![]() |
| T210 - Mayflower entrance G precast honeycomb wall installation |
![]() |
| T210 - Mayflower Station |
![]() |
| T211 - Bright Hill |
![]() |
| T211 - Entrance D ground beam extension |
![]() |
| T212 - ULS |
![]() |
| T212 - Granite tile installation at Upper Thomson platform |
![]() |
| T213 - Caldecott Station |
![]() |
| T213 - M&E Installation at platform level |
![]() |
| T215 - Mount Pleasant Site |
![]() |
| T215 - Commencement of track laying works from the staging area |
![]() |
| T216 - Escalators installed at entrance C and D |
![]() |
| T216 - Dismantling of TBM 1 |
![]() |
| T217 - Casting of Napier roof slab |
![]() |
| T217 - Falsework beneath road decking for casting |
![]() |
| T218 - Orchard Boulevard Entrance A BSC |
![]() |
| T218 - Removal of traffic decking at entrance B area |
![]() |
| T219 - Orchard entrance B site area |
![]() |
| T219 - Orchard mining beneath NSL station |
![]() |
| T220 - Great World station construction of upper concourse level at south launch shaft |
![]() |
| T220 - Condensate and chill water pipe installation works at upper concourse level |
![]() |
| T221 - Havelock entrance A ground level RC works |
![]() |
| T222 - Outram Park Entrance B RC works |
![]() |
| T223 - SBP works at Maxwell entrance C |
![]() |
| T223 - Upper underplatform level trackside PSD RC downhang beam |
![]() |
| T225 - Shenton Way Station |
![]() |
| T225 - Breakthrough of knock out panels at interface of Asia Square tower 2 |
![]() |
| T226 - Marina Bay vent shaft 4 structure |
![]() |
| T226 - SCL tunnel completed at mined Changi Bound tunnel |
![]() |
| T227 - Marina South cut and cover tunnel area |
![]() |
| T227 - Marina South concourse cat B rooms |
![]() |
| T228 - Backfilling at Gardens by the Bay Station |
![]() |
| T228 - Structural Steel works at entrance C |