Excavation and casting works have reached the lowest point of the station's structure at the platform level. Casting of the paid linkway roof and entrance substructures are ongoing.
| T226 Marina Bay Station |
| NSL paid link |
| S2 waler and I-beams removed for the casting of RC walls up to ground level |
| Interface with LS4 |
| CCL paid & unpaid linkway |
| Unpaid link roof structure completed alongside the existing CCL platform |
| Casting of perimeter walls around the mezzanine level |
| Entrance C site with linkage to the NSL-TEL paid link |
| Concourse slab cast, with a direct linkage to the B3 transfer level to TEL beneath the CCL tunnels |
| Entrance B site |
| RC ground to concourse staircase cast, lift shaft being cast |
| Station box at the lower platform level |