D-walling works continue and progresses southwards along the cut and cover tunnel, while excavation works and casting of the roof slab for the top down construction of the station box takes place. Excavation of the launch shaft is ongoing.
Construction of the diaphragm wall for the cut and cover tunnel adjacent to the Orchard station box |