Monday, 9 October 2017

Marina Bay Cast (IV)

Excavation and casting works have reached the lowest point of the station's structure at the platform level. Casting of the paid linkway roof and entrance substructures are ongoing.


T226 Marina Bay Station
NSL paid link

S2 waler and I-beams removed for the casting of RC walls up to ground level

Interface with LS4
CCL paid & unpaid linkway
Unpaid link roof structure completed alongside the existing CCL platform
Casting of perimeter walls around the mezzanine level



Entrance C site with linkage to the NSL-TEL paid link
Concourse slab cast, with a direct linkage to the B3 transfer level to TEL beneath the CCL tunnels

Entrance B site
RC ground to concourse staircase cast, lift shaft being cast

Station box at the lower platform level

No comments:

Post a Comment

Note: only a member of this blog may post a comment.