Station site |
Lowering of replacement shield for TBM S-963 in end Q1 for second drive towards Orchard Boulevard (Photo: Asiagroup Crane) |
TBM assembly inside launch shaft on Woodlands bound drive |
RC works presumably at platform level |
Underpass works at ION orchard |
Excavation of subway linkway to Wheelock |
Excavation works for cut and cover tunnel |
Tunnel roof slab cast |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.