D-walling works for the project have been fully completed at the cut and cover tunnel ahead of schedule and excavation works have commenced there. Basement casting of the concourse slab is taking place at the station box. A major traffic realignment is being prepared at the Orchard/Paterson intersection for the underpass works.
Completed roof slab at Orchard station |
Underpinning works beneath ION orchard and existing NSL station |
Construction of underpass beneath Orchard Boulevard traffic diversion (Photo credit: LTA, June 2016) |
Preparations for traffic realignment at the Paterson road junction. Road medians have demolished and surfaced with asphalt |
TBM S-963 is transitioning to main drive with the backup gantries lowered |
Casting of the concourse slab underway |
Completion of diaphragm wall for the cut and cover tunnel |
Storage yard for tunnel segments |
Demobilization of d-wall grab |
Excavation of topsoil at the cut and cover tunnel |
Ground improvement works |
T220 interface |
C&C tunnel overview |