The Maxwell station under T223 will have 3 levels. The formation level is proposed to be 31m beneath the surface of Neil Road. The station will have 3 entrances. Entrance A will be built infront of Kreta Ayer Heights; Entrance B will be at Maxwell Food Centre and Entrance C will be located at the Chinese temple.
Following the closure of Dickenson Hill, the bentonite silos have been erected and a treatment plant has been assembled. A hydrofraise trench cutter has been brought to the site. The site office is currently being built in the center of the site. Several traffic diversions for Neil Road has been planned and will be executed in phases.
|
Bentonite plant and silos |
|
T223 Site office in the midst of construction |
|
South of the site |
|
Entrance A will be located here |
|
Pearl Centre and Pearls Bank where the tunnels from Outram Park will come down |
|
Construction of site office |