T213 - Overview of Caldecott |
T213 - Covered linkway installation |
T215 - Mount Pleasant Entrance A |
T215 - PSD installation at platform |
T216 - Ceiling frame installation at DTL linkway |
T216 - VE Panel installation at DTL Linkway |
T217 - Curvilinear Wall installation at Napier mezzanine level |
T217 - VE Panel at Lower Platform level |
T218 - POB across entrance B at Orchard Boulevard station |
T218 - Cladding works at Orchard Boulevard concourse level |
T219 - Granite tile installation |
T220 - Lean concrete casting at formation level (River valley underpass) |
T220 - Ceiling works at Great World station upper concourse level |
T221 - Zion Road entrance |
T221 - Installation of wall bracket at Havelock concourse level |
T222 - Reinstatement works at Outram Park |
T222 - Travellator installation at new unpaid linkway |
T223 - Reinstatement works at Maxwell |
T223 - Entrance A Maxwell |
T225 - Installation of steel structures for bus stop and taxi stand |
T225 - Shenton Way upper platform glass railing and granite floor installation |
T226 - External wall terracotta tiles at Marina Bay |
T227 - Marina South concourse |
T227 - Marina South entrance A |
T228 - Reinstatement works at Gardens by the Bay |
T228 - Panel installation works at platform |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.