The 36th and third last TBM for the line was lowered down the Great World launch shaft earlier this month, with several more bored tunnels having been completed since.
![]() |
TEL1&2 Tunnel Chart, January 2017 |
![]() |
TEL3 Tunnel Chart, January 2017 |