Sunday, 2 October 2016

Piling at Havelock (VI)

SBP works continue at Havelock station. Tunnelling works for the rectangular TBM which were envisaged by the project team to have been completed now, are only midway through with 61 segments jacked thus far.


Preparations for the installation of R61 at the Havelock launch shaft

Segment storage yard
Segment casting works

Entrance E
The RTBM has crossed the Havelock intersection and is beside Holiday Inn now
Entrance D where the RTBM has crossed





Entrance A

Piling works



Entrance B
Station box and Entrance A,B,C overview

No comments:

Post a Comment

Note: only a member of this blog may post a comment.