Tuesday, 29 September 2015

Piling at Napier (III)

Piling works continues along the center perimeter of the Napier station following the traffic diversion in July. Excavation of the launch shaft is ongoing.


Excavation of the launch shaft

Monday, 28 September 2015

Stevens D-walls (II)

Excavation of the Dalvey launch shaft is now midway completed. The slurry treatment plant is in the midst of installation beside the shaft. D-walling and piling works continues at the Stevens station. Updates for the launch shaft at Mount Pleasant can be found here.


Excavation and grouting at the Dalvey launch shaft

Saturday, 26 September 2015

Haze Contingency Measures

In light of the recent deterioration of the haze conditions across the country, preventive actions have been stepped up to protect the welfare and safety of the workers exposed to the hazardous outdoor conditions. The T206 Launch Shaft site was visited by the media yesterday afternoon to find out more about the numerous precautionary measures that have been implemented at the site.