Excavation works continue towards the formation level at the lower underplatform level. JGP works are taking place beneath the NSL and CCL tunnels, prior to the commencement of ground freezing and the subsequent SCL construction of the twin mainline stacked mined tunnels next quarter.
Marina Bay Station |
Entrance B casting of internal structure works at concourse level up to ground level |
Vent shaft |
Linkway works |
Casting of Entrance A concourse slab above CCL paid linkway |
Concourse slab cast over CCL unpaid linkway |
CCL linkway overview |
NSL paid link roof slab cast |
Tunnel ventilation & ECS alterations at the NSL platform |
A&A works started for the hacking works at the NSL concourse |
Overview of NSL linkway, LS4 & MS1 |
Entrance C RC works |