T201 - Driveway within Mandai Bus Depot
T202 - Entrance D Structural Steel roof works
T202 - Cladding works at Woodlands North Concourse level
T203 - Woodlands Station
T203 - PSD installation at platform
T205 - Woodlands South Entrance C ceiling works
T205 - Installation of travellators at concourse level to future Woodlands health complex
T206 - Reinstatement works at ES1
T207 - Temporary boundary operational limits for TEL1 setup at the RTS Facility Building
T208 - Springleaf vent shaft RC works completed
T208 - Springleaf concourse level free area flood screening completed
T209 - Lentor Station
T209 - RC works at Entrance A
T210 - Mayflower entrance G precast honeycomb wall installation
T210 - Mayflower Station
T211 - Bright Hill
T211 - Entrance D ground beam extension
T212 - ULS
T212 - Granite tile installation at Upper Thomson platform
T213 - Caldecott Station
T213 - M&E Installation at platform level
T215 - Mount Pleasant Site
T215 - Commencement of track laying works from the staging area
T216 - Escalators installed at entrance C and D
T216 - Dismantling of TBM 1
T217 - Casting of Napier roof slab
T217 - Falsework beneath road decking for casting
T218 - Orchard Boulevard Entrance A BSC
T218 - Removal of traffic decking at entrance B area
T219 - Orchard entrance B site area
T219 - Orchard mining beneath NSL station
T220 - Great World station construction of upper concourse level at south launch shaft
T220 - Condensate and chill water pipe installation works at upper concourse level
T221 - Havelock entrance A ground level RC works
T222 - Outram Park Entrance B RC works
T223 - SBP works at Maxwell entrance C
T223 - Upper underplatform level trackside PSD RC downhang beam
T225 - Shenton Way Station
T225 - Breakthrough of knock out panels at interface of Asia Square tower 2
T226 - Marina Bay vent shaft 4 structure
T226 - SCL tunnel completed at mined Changi Bound tunnel
T227 - Marina South cut and cover tunnel area
T227 - Marina South concourse cat B rooms
T228 - Backfilling at Gardens by the Bay Station
T228 - Structural Steel works at entrance C