Architectural and M&E works are taking place within the completed structure of the RTS facility building. The completed 2 tunnels from SBAB have been handed over to T250, while FSC works are underway along the 2 tunnels from Springleaf. The launch shaft at Springleaf has also been handed back to T208 for the structural & subsequent backfilling works.
RTS Facility Building |
Removal of hoardings & gantry cranes dismantled by T207. Site handed over back to T208. |
RC works for the tunnel wall construction |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.