Excavation and casting works have reached the lowest point of the station's structure at the platform level. Casting of the paid linkway roof and entrance substructures are ongoing.
T226 Marina Bay Station |
NSL paid link |
S2 waler and I-beams removed for the casting of RC walls up to ground level |
Interface with LS4 |
CCL paid & unpaid linkway |
Unpaid link roof structure completed alongside the existing CCL platform |
Casting of perimeter walls around the mezzanine level |
Entrance C site with linkage to the NSL-TEL paid link |
Concourse slab cast, with a direct linkage to the B3 transfer level to TEL beneath the CCL tunnels |
Entrance B site |
RC ground to concourse staircase cast, lift shaft being cast |
Station box at the lower platform level |