The 36th and third last TBM for the line was lowered down the Great World launch shaft earlier this month, with several more bored tunnels having been completed since.
TEL1&2 Tunnel Chart, January 2017 |
TEL3 Tunnel Chart, January 2017 |
T219: Completion of Herrenknecht EPBM S-963 Woodlands bound between Orchard and Orchard Boulevard on Jan 20 |
T220: Lowering of Slurry TBM S-946 at the Great World south launch shaft |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.