Deep excavation works are ongoing at the station box.


Lentor Station
Entrance D casting works
Rebar works (Photo: Riccardo)
Casting of basement roof slab (Photo: Riccardo)



Excavation works at station







Excavation works

Calrose entrance


Launch Shaft (TBM 2 mining works ongoing)
Breakthrough of TBM 1 at 5XO (Photo: Aentorn)



Casting works

Excavation works at the re-launch point