Bulk excavation works are underway at the station and cut and cover tunnels. The remaining pipe pile construction is being carried out beneath the former Marina Boulevard.
| Excavation works at the cut and cover tunnel |
| Pipe pile construction beneath the old road |
| Excavation at Marina South station |
| Ground improvement works to Marina Bay |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.