More About Us

Friday, 24 June 2016

Marina Bay Cast

RC works for the concourse slab are in progress at the Marina Bay station, while piling works commence for the interchange linkway to the North South Line. Sheares Avenue have opened between Maxwell Road and Central Boulevard, providing an interim linkage within the restricted zone of the CBD. The permanent road will be realigned towards the end of the project, and will be served by Entrance B and 2 ventilation buildings under the TEL project.


Opening of Sheares Avenue by the T226 team


Excavation works at the concourse level








Preparation works at the open-air TBM shaft (left)


Piling works at NSL linkway

No comments:

Post a Comment

Note: only a member of this blog may post a comment.