Excavation works at the station have reached the formation level with the final S8 layer installed at the bottom of the station and RC works for the underplatform level will begin by the next quarter. RC works are in progress at entrances A & E.
Entrance E & D |
Hacking of ground slab and earthworks at the former RTBM staging area |
Basement roof slab cast at the launch shaft |
Formwork for the external wall up from the upper concourse to the roof level |
Excavation works at entrance D |
Station area |
Entrance A RC works at the upper concourse level |
S8 struts installed at GL1-4 |
Entrance C |
Entrance B subway |