Casting of the station structure is progressing at the concourse level up to the basement roof slab.
T228 Gardens By The Bay Station |
GL1-8 |
RC works from Concourse level up to roof slab |
Concourse slab completed at center zone |
Casting of platform level up to concourse level for the tunnel ventilation and other mechanical rooms |
Entrance C |
Waterproofing to roof slab over concourse level |
Opening in roof slab for the surface entrance |
GBME shaft amidst the Marina Bay Golf Course |
Interfacing T302 DCM works along the bored tunnel path. The D-wall works for TE22a Marina East was recently completed. |