More About Us

Friday, 13 October 2017

Gardens By The Bay Cast (III)

Casting of the station structure is progressing at the concourse level up to the basement roof slab.


T228 Gardens By The Bay Station

GL1-8
RC works from Concourse level up to roof slab
Concourse slab completed at center zone

Casting of platform level up to concourse level for the tunnel ventilation and other mechanical rooms

Entrance C

Waterproofing to roof slab over concourse level


Opening in roof slab for the surface entrance

GBME shaft amidst the Marina Bay Golf Course 
Interfacing T302 DCM works along the bored tunnel path. The D-wall works for TE22a Marina East was recently completed.
GBME shaft. RC segments are fed from the station site through the completed Changi bound tunnel, where they are hoisted over across the shaft for the ongoing returning Woodlands bound drive, minimizing site activity at the Bay East side.

No comments:

Post a Comment

Note: only a member of this blog may post a comment.