More About Us

Monday, 4 September 2017

Woodlands South Cast (II)

A final realignment of Woodlands Avenue 1 has been implemented for the excavation and construction of Entrance D, the last of the 4 entrances to be built. Structure of the station has reached the platform level, and the superstructure of Entrance A is emerging from ground level.


Woodlands South Station
Entrance A and vent shaft superstructure
Entrance A
Construction of escalator ramp for entrance B
Structure of the station at the platform level
Realignment of Avenue 1 around entrance D
Entrance D excavation

Entrance C and UPN overview

Entrance C
UPN link to WHC

No comments:

Post a Comment

Note: only a member of this blog may post a comment.