Excavation works have reached the lower concourse level and casting of the structure is progressing. Excavation and casting of the platform and underplatform levels will be carried out through the year. Excavation works for the mining shaft for the underpass leading to entrance B have commenced at the facade of Camden Medical Centre along Grange Road.
Overview of T218 site |
Casting works at the station box |
Excavation has reached down to the 4th layer (lower concourse level) |
Pavement reconstructed at the TBM docking area |
Possible reinstatement of road by the next quarter |
Traffic realignment along Grange Road in mid March for entrance B works |
Excavation of completed sheet pile-constructed shaft |
Traffic alignment along Grange Road |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.