SBP works continue at Havelock station. Tunnelling works for the rectangular TBM which were envisaged by the project team to have been completed now, are only midway through with 61 segments jacked thus far.
Preparations for the installation of R61 at the Havelock launch shaft |
The RTBM has crossed the Havelock intersection and is beside Holiday Inn now |
Entrance A |
Piling works |
Entrance B |
Station box and Entrance A,B,C overview |