The Hitachi Zosen EPBM was lowered down the launch shaft in August and assembly works are underway beneath the road deck. Excavation works are mostly completed along the station box, and RC works have commenced for the base slab at the southern end.
T228 Gardens By The Bay station |
Station box |
South end |
RC works |
Excavation works nearing the formation level |
Launch Shaft |
Lowering of the lower front shield (Photo: Yu Sin) |
Lowering of the bearing |
Lowering of the upper front shield (Photo: Yu Sin) |
Lowering of the cutterhead |
Launch shaft and Entrance C |
Ent C |
GBME retrieval shaft |
TEL 3 Tunnel Chart, September 2016 |