Bulk excavation works for the station box have reached the S5 layer and is nearing the formation level. Bored pile works are still being done at the crossover cut and cover tunnel.
|
T203 Woodlands Station |
|
Bored pile works at the c&c tunnel |
|
Traffic realignment of Ave 2/5 junction for the final bored pile works at the crossover tunnel earlier this quarter |